Subslab Plumbing InstalledAfter the stem wall has been laid, the plumbing is run below the slab. The dark pipe laying in straight lines along the ground is 3" ABS running to the septic tank. The colored pipes are copper with a plastic sleeve (for protection) carrying cold water. The thin black pipes running up into the air are hot water pipes with foam insulation. September 25, 1998
|