The
Foundation |
The Block
Wall |
The Roof | Interior Framing |
||||
Compacting the FillAfter the plumbing has been installed, the inside perimeter of the house is filled with about 12" of dirt. This raises the inside floor above the outside grade and provides a very strong, firm surface for the concrete slab. September 28, 1998
|