The
Foundation |
The Block
Wall |
The Roof | Interior Framing |
||||
Digging the FooterA backhoe is used to dig the trench around the outline of the house into which concrete will be poured creating the footer. The operator has to be careful to dig a trench 24" wide, 20" deep, and along the chaulk marks. September 8, 1998
|