The
Foundation |
The Block
Wall |
The Roof | Interior Framing |
||||||||
Placing the Pond Boulders
A crane is used to lift the boulders up on the waterfall. The boulders weigh 10-20 tons. The boulder shown on the lower right is the high jump (about 5 feet above the water), there is a low jump hidden beyond it. January 25, 2000
|