The
Foundation |
The Block
Wall |
The Roof | Interior Framing |
||||
The Wall Part Way FinishedThe wall has been built up about half way. The block layers work from the scaffolds shown here around the outside of the building. The boards on stands along the top of the scaffolds are used to hold the mortar with which the blocks are laid. November 3, 1998
|